X

Sheridan Construction was selected to manage the renovation of the MRI, and CT labs at Piedmont Hospital Macon, all within an active hospital environment. The project presented several obstacles, including inaccurate site surveys and the need to relocate numerous utilities, but Sheridan quickly addressed these issues by surveying the areas and coordinating closely with the design team. The team also worked through complex asbestos abatement challenges, finding a cost-effective solution by encapsulating the material, saving the hospital money. Maintaining the highest ICRA barriers was crucial due to the proximity of operating rooms. One of the most complex tasks was installing the 8-ton MRI and 6-ton CT machines by cutting a hole in the building and craning them in. Sheridan also overcame last-minute HVAC design changes, sourcing rooftop units in just two weeks. Despite tight timelines and challenges, Sheridan completed the project without disrupting hospital operations, delivering exceptional results.

Location: Macon, Georgia
Owner: Piedmont Hospital
Architect: Gresham Smith Architects

Portfolio